Forum Discussion
Ah, I was hoping the JMSConsumer had a timeout. It does have a ‘Control Destination’ that I think you can use to stop it.
The ability to stop a scheduled task after a period of time was added in the 4.10 release (see the tasks page). Be aware that stopping a pipeline is a pretty harsh operation, any snaps that are actively working will be interrupted and you might lose data.