02-05-2024 03:27 AM
I have scheduled a pipeline using cron job to run every 2 minute which checks runs a sql query to check a table from sql server if its updated. once the condition i have checked meets, a child pipeline is called which does the actual permission. i have made the pipeline to run after 2 minutes between the certain time period but i want to make sure if the child pipeline was executed once, the pipeline should ne be retriggered the next minute. Is there any way i can implement this functionality?